Re-Open a Cancelled or Completed Project

Highlighted
victoria loft
Super Contributor.

Re-Open a Cancelled or Completed Project

Is it possible to Re-Open a Cancelled or Completed Project?
4 REPLIES
SID_24
Respected Contributor.

Re: Re-Open a Cancelled or Completed Project

Hi
Yes, it possible
Open WF in WorkBensh. In 'Workflow' tab in 'reopen step' field set specify a demanded step on which it is necessary to move the project after reopening
Carolyn Barmeie
Trusted Contributor.

Re: Re-Open a Cancelled or Completed Project

Hi, I have added the option to re-open when a request is closed. The button does show and I select it. (I have set the security on the step iwth a group I am in). It appears to be in a loop, which just sends me back to closed step. When I look at the graphic view, the re-open step is active but no fields are available. I have set the fields to be editable on the status dependencies tab when the status is Closed. What step have I missed? Thanks, Carolyn
SID_24
Respected Contributor.

Re: Re-Open a Cancelled or Completed Project

Hi, try the offered scheme in attachment, should work.
Good luck
Carolyn Barmeie
Trusted Contributor.

Re: Re-Open a Cancelled or Completed Project

Thank you very much for the attachment. I had the wrong thought process for which step should be the Re-open step. Thanks again!!! Carolyn