I have a table component within a request which has 2 date fields within it.

I have 2 UI rules that compare if the start date is after than the finish date and if the finish date is before the start date, to ensure a correct date range is entered. If triggered a message box should appear.

However these rules seem not to be triggering. Ive attached a screen shot of my rule, does anyone know if there are any issues with rules in tables?

Thanks.
2 REPLIES
Erik Cole
Honored Contributor

Re: Issue with UI rule in Table Component

What patch level are you on? SP3 and later have a bunch of fixes to UI rules...
b460
Regular Collector

Re: Issue with UI rule in Table Component

We are on 7.5 SP3.