Hi,

i posted the same problem before but this is important and urgent.

i get an error while i am trying to enable the qc project.

I applied all the suggested things in the MAC user manual.I did the following things respectively :

I installed the MAC software,
I created the "Contact User Data",
I added the values to the "CRT-Priority-Enabled" validation,
I enabled the web services in the PPM config file,

Then i installed the "ppmqcintegrationtool".I made the PPM Center Settings.Test connection to the PPM server was succesfull.But i can't enable a Qality Center Project for the Integration.

In fact i can't connect to the Quality Center through this tool.Although both the username and password is correct,i get the "Run-time 91 error".

Thanks in advance.