Cost Rule and Rate Calculation

Hi,

I am using PPM 8.0. I have a porlet and a report which needs resource rate during a period of time. I have cost rule defined with 3 factors and one of it is project.

Do someone have some function or procedure which determines the rule that system wil opt for calculation of cost in case time mgmt is enabled.

Thanks
Sangiliraja.P