We are going to upgrade ITG 6.0 SP15 on Window Server with Documentum 5.2 integration to PPM 7.5 with DCMT 5.3. Is there any best practice or related documents? How is the complexity comparing with upgrade without DCMT integration?

My major concern is the Documentum upgrade, which we have to have a separate server for DCMT 5.3 Index Server/Agent. Currently all components of our DCMT 5.2 resides on a same physical server with ITG at application side.

We will take a general approach of testing upgrade with cloned instances.